<?xml version="1.0" encoding="UTF-8"?>
<rdf:RDF xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns="http://purl.org/rss/1.0/" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <channel rdf:about="https://repository.kopri.re.kr/handle/201206/22">
    <title>DSpace Collection:</title>
    <link>https://repository.kopri.re.kr/handle/201206/22</link>
    <description />
    <items>
      <rdf:Seq>
        <rdf:li rdf:resource="https://repository.kopri.re.kr/handle/201206/4950" />
        <rdf:li rdf:resource="https://repository.kopri.re.kr/handle/201206/4949" />
        <rdf:li rdf:resource="https://repository.kopri.re.kr/handle/201206/4948" />
        <rdf:li rdf:resource="https://repository.kopri.re.kr/handle/201206/4952" />
      </rdf:Seq>
    </items>
    <dc:date>2026-04-07T04:36:37Z</dc:date>
  </channel>
  <item rdf:about="https://repository.kopri.re.kr/handle/201206/4950">
    <title>Opening of Chile-Korea Antarctic Cooperation Center</title>
    <link>https://repository.kopri.re.kr/handle/201206/4950</link>
    <description>Title: Opening of Chile-Korea Antarctic Cooperation Center
Authors: Rep. of Korea
Abstract: This Information Paper introduces part of the activities</description>
    <dc:date>2017-07-04T00:00:00Z</dc:date>
  </item>
  <item rdf:about="https://repository.kopri.re.kr/handle/201206/4949">
    <title>Report of the Intersessional Contact Group on Inspections in Antarctica under Article VII of the Antarctic Treaty and Article 14 of the Environmental Protocol</title>
    <link>https://repository.kopri.re.kr/handle/201206/4949</link>
    <description>Title: Report of the Intersessional Contact Group on Inspections in Antarctica under Article VII of the Antarctic Treaty and Article 14 of the Environmental Protocol
Authors: Rep. of Korea
Abstract: ATCM XXXIX agreed to establish an ICG to consider the practice of conducting inspections under Article VII of the Antarctic Treaty and Article 14 of the Environmental Protocol. Based on a number of questions, the ICG discussed the practice of inspections and explored options to enhance the effective organisation of inspections, including the promotion of cooperation in conducting inspections, as appropriate. This Working Paper contains the questions that constituted the basis of the ICG's discussions, summarises the views expressed by the participants and provides a number of recommendations to Working Group 2 at ATCM XL.</description>
    <dc:date>2017-07-04T00:00:00Z</dc:date>
  </item>
  <item rdf:about="https://repository.kopri.re.kr/handle/201206/4948">
    <title>Green Expedition in the Antarctic</title>
    <link>https://repository.kopri.re.kr/handle/201206/4948</link>
    <description>Title: Green Expedition in the Antarctic
Authors: Rep. of Korea
Abstract: This working paper introduces the Green Expedition concept and presents a Resolution proposal reminding Parties of their commitment under the Environmental Protocol to plan and conduct their activities in Antarctica in an efficient and sustainable way.</description>
    <dc:date>2017-07-04T00:00:00Z</dc:date>
  </item>
  <item rdf:about="https://repository.kopri.re.kr/handle/201206/4952">
    <title>Information on the Progress of the Renovation of the King Sejong Korean Antarctic Station on King George Island, South Shetland Islands</title>
    <link>https://repository.kopri.re.kr/handle/201206/4952</link>
    <description>Title: Information on the Progress of the Renovation of the King Sejong Korean Antarctic Station on King George Island, South Shetland Islands
Authors: Rep. of Korea
Abstract: The King Sejong Station, operated by the Republic of Korea, was constructed in 1988 on the Barton Peninsula, King George Island, off the South Shetland Islands. Most of the research and summer accommodation facilities had been used for almost 30 years and were in need of repair and reconstruction. Renovations were required to not only address safety concerns of the outworn facilities, but also to further elevate the quality of research support.&#xD;
The construction activities planned for 2016/17 season started in November 2016 and will finish on 9 April 2017. The removal of the old facilities and the replacement of the fuel tanks are now completed. The new two-story building containing research facilities and summer accommodation has almost been completed, except for some parts of electrical and interior works. The overall construction process will be 86% accomplished by the time when the construction personnel will be evacuated. All activities including cleaning up the site will be completed by December 2017. In order to minimize the environmental impact, mitigation measures were carried out throughout the entire period, in compliance with the Initial Environmental Evaluation (IEE) document for the renovation activities which had been endorsed by the Ministry of Foreign Affairs, Republic of Korea in September 2016.</description>
    <dc:date>2017-06-04T00:00:00Z</dc:date>
  </item>
</rdf:RDF>

